Weeks of stock cover tells you how long current stock lasts at the rate it’s selling.
Divide sellable, uncommitted stock by expected weekly demand to calculate weeks of stock cover. To identify slow-moving items, check that figure against recent sales frequency and the time left to sell the stock: 12 weeks of stock cover means something different for an undated project insert than for a dated refill with six weeks left in its selling window.
When printing and assembling planner inserts, calculate weeks of stock cover in finished packs, not printed sheets. Count each format separately, too. A stack punched for discs cannot fill a ring binder order even if the pages came off the same print run.
Calculate weeks of stock cover in six steps
Set the stock unit and separate incompatible formats. Use the unit the customer orders. If one sale is for a pack of 12 sheets, stock of 24 finished packs and demand of six packs per week give four weeks of stock cover. Entering the stock as 288 sheets against demand of six packs would give a misleading 48 weeks.
Give each combination of page size, punch pattern, layout and date range its own stock code when those differences affect what a customer can use. The 2027-2028 monthly refill in the 11-disc format and the 2027-2028 monthly refill in the 7/3-hole format are both listed at 8.5 × 11 inches, but the punch patterns are different.
Layout is a separate distinction. The Forvencer 2027 six-hole A5 monthly refill and the A5 six-hole project planning refill serve different uses. For the 2027-2028 monthly inserts for six-ring binders, record the stated fit and verify dimensions and ring spacing before grouping the stock with another format.
Count the finished stock, then deduct commitments. Take the count at a recorded cut-off, such as after Friday despatch. Count complete packs by stock code and location. Keep damaged packs, incomplete sets, unpunched stacks and items awaiting inspection out of the sellable count. If orders move during the count, log them against the cut-off so they aren’t missed or deducted twice.
Subtract open customer commitments that haven’t already been removed from stock. If there are 60 sellable packs and eight reserved for open orders, there are 52 packs free to cover new demand. Record confirmed receipts and future print batches separately; a delivery due next Tuesday can’t fill an order today. If the system mixes reserved, backordered and incoming stock, reconcile those quantities before calculating availability.
For a workflow that combines purchases, sales and in-house assembly, the Tallyhive inventory tracker for Google Sheets and Excel records purchases, sales and production. Its recipe function can deduct materials when production is logged, so the paper used and the finished packs produced can be recorded as different stock movements.
Calculate expected weekly demand in the same unit. For a steady line, start with eight completed weeks. If customers ordered 80 packs across that period, use 10 packs per week. Include zero-order weeks when the item was available and customers could buy it. Exclude transfers and count adjustments: moving 20 packs to another site doesn’t create customer demand.
Use customer orders net of cancellations if order data is reliable. If you only have shipment history, a week when the shelf was empty isn’t reliable evidence of weak demand. Check recorded backorders or other verifiable unmet orders, count each order once, and mark any gap you can’t estimate. For dated inserts, check comparable weeks from the previous selling season if available; averaging a calendar launch with its quiet tail can distort both periods.
Divide free stock by weekly demand. The formula is weeks of stock cover = free sellable packs ÷ expected weekly demand in packs. With 52 packs free and expected demand of eight per week, weeks of stock cover come to 6.5. Keep the decimal for comparison with replenishment lead time; rounding down to six weeks can change a borderline decision.
In a spreadsheet, put free stock in column C and forecast packs per week in column D. In row 2, use
=IF(D2>0,C2/D2,"")for cover, with a separate status field for zero demand or missing data. Positive stock with zero forecast demand does not have zero weeks of stock cover. Put it into review as no forecast demand rather than giving it a number that sorts alongside items about to run out.Compare cover with the time needed to replenish. For a weekly review, allow for replenishment lead time, the gap until the next review and the safety stock policy. At eight packs per week, a two-week lead time, a one-week review interval and eight packs of safety stock imply a review target of 32 packs. If there’s no stock due in and 52 packs are free, the item doesn’t need topping up to that target.
For in-house printing, lead time ends when the batch is ready to sell, not when the printer stops. Include any paper wait, trimming, punching, collation and pack checks. If stock is monitored between scheduled reviews, calculate a reorder point from lead time, demand and safety stock rather than treating the periodic review target as the trigger.
Flag slow movement separately from excess cover. Use two tests. For example, send an established line to review if it has more than eight weeks of stock cover and recorded demand in no more than one of the last four weeks. Those are starting thresholds for a weekly review, not universal cut-offs. A line selling in all four weeks can still have excess stock after a large batch, but it isn’t slow by this test.
Add a separate date-risk flag. If a dated pack has six useful selling weeks left, compare free stock with expected sales over those six weeks, even if the pack sells every week. Use a week-by-week forecast if demand is expected to drop after a calendar start date. When several lines need review at once, rank items by annual usage value to help decide which deserve tighter count and replenishment controls. For a clearance decision, use the cost of the stock at risk as well.
Worked example: from the Friday count to the next print decision
Take a hypothetical planner insert shop with two dated monthly formats. The stock record shows 120 disc-punched packs. A Friday count finds 114, of which six have torn punch slots. Record the six missing packs as a count discrepancy and move the six damaged packs out of sellable stock. That leaves 108 sellable packs. Twelve are already committed to open orders, so 96 packs are free.
The eight completed weeks of order demand were 8, 10, 9, 11, 8, 12, 10 and 12 packs. That’s 80 packs, or 10 per week. Use that rate as an estimate of new demand, without adding the 12 orders already covered by reserved stock. Current cover is 96 ÷ 10 = 9.6 weeks.
At a two-week print and assembly lead time, a one-week review interval and 10 packs of safety stock, the review target is 40 packs. There are no further batches due. With 96 packs free, the shop should skip the next print run. The disc format isn’t slow under the review rule because it sold in all four recent weeks. It still has date risk: if six selling weeks remain at 10 packs per week, about 36 packs could be left over.
The ring-punched format has 40 free packs and sold four over the same eight completed weeks. Only one of the last four weeks had a sale. At 0.5 packs per week, it has 80 weeks of cover and meets both slow-movement tests. With the same six-week selling window, the forecast is three more sales, leaving about 37 packs at risk. At that low rate, one order can move the estimate sharply, so use 37 as a planning figure, not a guaranteed clearance quantity.
The print decision is the same for both lines, but the stock action differs. Keep the disc format listed at its normal price while reviewing actual sales against the six-week forecast. For the ring format, check the fit details and listing status first. If both are correct and demand remains low, consider a limited markdown or a bundle with a compatible binder before the selling window closes.
Fix the counts and forecasts that mislead the review
Check the physical count before changing a purchase order
If a line swings from three weeks of stock cover to nine without a receipt or a clear drop in demand, check the unit and the bin before changing the order. A carton entered as 24 packs when it contains 24 sheets can create enough apparent cover to cancel a needed batch. Ask the counter to record what is physically there without seeing the expected quantity, then investigate the variance with a blind cycle count.
When analysing a batch in progress, record how many complete packs it can yield and when they’ll be ready. A stack of 120 acceptable sheets for a 12-sheet pack can supply 10 packs on paper. If only eight backing cards are available and each pack needs one, the batch can yield eight sellable packs before more cards arrive. Add those eight to a dated production plan, not to today’s free stock.
For purchased stock held across several locations, the Binsight inventory management spreadsheet for Excel records stock movements, transfers and count corrections. Its reorder alerts and supplier purchase order workflow are useful after the count is reconciled and a replenishment decision has been made.
Use format checks to catch stock that looks interchangeable
Put the format check on the assembly sheet as well as the stock record. These listings illustrate what to verify before assigning a finished pack to a bin or printing another batch.
Disc versus hole punches. The 2027-2028 monthly 11-disc refill is listed as an 8.5 × 11-inch refill with 18 monthly calendars. The 2027-2028 monthly 7/3-hole refill is also listed at 8.5 × 11 inches with 18 monthly calendars. Check one finished sample against the intended binding before the rest of the run is punched.
Monthly pages versus project pages. The Forvencer 2027 six-hole A5 monthly refill is a dated calendar line. The A5 six-hole project planning refill is listed as 100 sheets and 200 printed pages. For double-sided packs, give the assembly team a sheet count as well as a page count so both the bill of materials and the physical count use the right unit.
Ring count versus verified fit. The 2027-2028 monthly inserts for six-ring binders illustrate why a ring count alone isn’t a fit check. Before transferring stock between bins marked “six-ring”, measure a sample and compare the hole positions with the binder specification.
Separate weak demand from stock customers couldn’t buy
Zero sales across four weeks means little if the listing was inactive for three of them. Record available weeks alongside sales weeks so the review distinguishes a line that was offered but ignored from one that was unavailable. If an item gets one order for 24 packs from an office every quarter, check the next order date before flagging the line on an eight-week average.
If sales are expected to change before the next delivery, project the balance by week rather than relying on a single cover figure. With 18 free packs, demand of 12 in week one and 12 in week two, and 30 more packs due in week three, demand exceeds current free stock by six packs before the receipt arrives. Adding the 30 incoming packs to today’s count would hide that gap.
At the next stock review, give each flagged line one action and a date: recount the bin before ordering, cancel the next batch, or test a markdown while a dated refill can still sell. If the decision rests on an unverified count or one unusual order, resolve that point before changing the print schedule.